November 2004
21/01/2009 14:09:11
The Electric Arc Furnace A at Alpha Steels Newport Factory has started production successfully, Inspec Solutions designed and supplied all control aspects of the Carbon Injection system, integrating the PLC and SCADA screens into the overall Melting Shop Control Systems, which are based on Siemens S7 PLC’s and WINCC SCADA systems. The “B” Furnace is due for startup in early 2005.